Year | Client / Contractor | Project Title | Dia (Inches) |
Length (km) |
Scope of Work | Location |
2016 | Dubai Petroleum / Technip | Rashid C Project | 42” | 5.50 | Flooding, Cleaning, Gauging and Hydrotesting | Dubai |
2016 | McDermott Middle East / ADMA OPCO | EPC for the facilities of 4 Gas Injectors (4GI) , Facilities for 32 New Oil Producers and Modifications on GIP Projects Phase 2 |
2 x 12” | 11.00/3.40 | Caliper pigging, intelligent pigging, dewatering, drying and nitrogen purging | Abu Dhabi |
2016 | PTTEP/COOEC | Zawatika Development Project Ph 1B | 18”/14”/18”/18” | 30/18/18/5 | Flooding, Cleaning, Guaging, Hydrotesting, Riser Testing, Final Leak Testing | Myanmar |
2016 | Saudi Aramco / L & T Arabia | Midyan Gas Power Plant Project | - | - | Rental of Filling Pumps | Saudi Arabia |
2016 | Dutco McConnel Dowell / DUSUP | DUSUP – Margham Capacity Increase Project | Pipe Sections | Various Dia | Hydrotest and Flushing of Pipe Spool Work | Dubai |
2016 | NDT Global | ADCO Habshan | - | - | Supply of technicians on rental basis | Abu Dhabi |
2016 | Hwachon Plant Construction Company / Barakah Nuclear Power Plant (BNPP) | BNPP CP –P1 (II) Project | Acid Cleaning – 40.37 m3 Oil Flushing – 41.01 m3 |
- | Acid Cleaning & Oil Flushing Work for process piping | Abu Dhabi |
2016 | ADCO / CCC | Qusawira Project | - | - | Supply of diesel pumping spread and Nitrogen Pumping Spread for Intelligent Pigging works | Abu Dhabi |
2016 | Saipem | Saudi – MRJN & Zulu Pipeline Project | - | - | Dewatering of Infield Pipeline with Nitrogen Gas | Saudi Arabia |
2016 | Audex | Fujairah Project | - | - | Vapour Blasting Equipment Rental | Fujairah |
Year | Client / Contractor | Project Title | Dia (Inches) |
Length (km) |
Scope of Work | Location |
2015 | ACS Offshore SPRL / Swiber Offshore | Vega Pleyade Offshore Project | 24” / 4” | 77 / 77 | Flooding, Cleaning, Gauging, Hydrotesting and Leak Testing | Argentina |
2015 | NPCC / ZADCO | - | - | - | Supply of filling pumps and technicians | Abu Dhabi |
2015 | Technip/Dubai Petroleum | EPC for Installation of offshore pipelines – Rashid C Project | 18” / 10” 12” / 8” 10” / 6” 30” |
25.5 / 0.3 29.9 / 0.3 31.2 /0.3 5.23 |
Flooding, Cleaning/Gauging, Hydrotesting and Dewatering | Dubai |
2015 | NSRP, JGCS/SKI, HHI | Nighi Son Refinery Project, SBP | 48" | 70 | Flooding, Cleaning, Gauging, Hydrotesting, SBM Leak Test, Caliper EGP Survey, Dewatering, Nitrogen Purging | Vietnam |
2015 | Al Wasimi Holdings / Saudi Aramco/ | Shaibah Interconnecting Pipelines | 36” / 30” | 27.0/27.0 | Cleaning, Gauging, Hydrotesting, Dewatering, Drying, Nitrogen Purging, Caliper Pigging and Intelligent Pigging | Saudi Arabia |
2015 | Supreme Offshore Private Limited/BG Exploration India/ | BG Pipeline Project, India | 10” | 8.0 | Flooding, Cleaning, Hydrotesting and Dewatering | India |
2015 | Gas Authority of India Limited (GAIL) | GAIL KG Basin Pipeline Project | 8”, 12”, 14”, 16” & 18” | Approx. 400 | Inertization, Hydrotesting, Dewatering, Swabbing, Vacuum Drying and Commissioning | India |
2015 | Gas Authority of India Limited (GAIL) | GAIL KG Basin Pipeline Project | 8”, 12”, 14”, 16” & 18” | Approx. 400 | Online Pigging | India |
2015 | Rosen | Gasco Habshan Inspection Works | - | - | Supply of 4” Temporary Launcher and Receiver | Dubai |
2015 | Quest Integrity Group / Dubai Petroleum | 16” FA – FB Project | 16” | 7.70 | Dewatering and Nitrogen Purging | Dubai |
2015 | Lin Scan | ADCO – UT Survey at NEB Field | - | - | Supply of pumping spread and manpower on rental basis for UT Survey | Abu Dhabi |
2015 | Hyundai Engineering | Group III Base Oil Production Facilities in Takreer Ruwais | 4”, 6”, 8” & 18” Pipe Sections | Various Lengths | Water Flushing, Cleaning Pigging of Interconnecting, Jetty and Process Piping Water flushing cleaning works |
Abu Dhabi |
2015 | Dubai Petroleum | EPC for Installation of offshore pipelines – Rashid C Project | - | - | Hire of Bolt Torqueing Equipment and Technicians | Dubai |
2015 | McDermott Middle East / ADMA OPCO | EPC for the facilities of 4 Gas Injectors (4GI) , Facilities for 32 New Oil Producers and Modifications on GIP Projects Phase 1 |
2 x 12” | 11.00/3.40 | Flushing, flooding, cleaning, gauging, hydrotesting, | Abu Dhabi |
2015 | ADCO/Galfar Engineering | EPC For New WAG Wells & Conversion of Existing Gas Injector Wells at WAG Wells at Sahil ADCO Contract No: 15646.01/EC 10875 |
4”/6” | From 0.2 Km to 7.00 | Cleaning, Gauging, Hydrotesting, Dewatering, Drying & Nitrogen Purging Works | Abu Dhabi, Sahil Fields |
2015 | Gulf Eco Friendly Services LLC | Gas Pipeline Project | 12” | 2.70 | Cleaning, Gauging, Hydrotesting, Dewatering, Swabbing, Drying and Nitrogen Purging | Sharjah |
2015 | Alsa Engineering | ADCO Project | - | - | Rental of Compressor | Abu Dhabi |
2015 | Lin Scan | ADMA OPCO Project | - | - | Supply of Flooding Spread on rental basis | Abu Dhabi |
2015 | Rosen / Total ABK | Total ABK Pipelines De-oiling and Baseline Inspection Project | 16”/ 8”/10” | 2.16 / 2.06 / 0.75 | Assistance in providing manpower and equipment spread for de-oiling, gauging, caliper and intelligent pigging | Abu Dhabi |
2015 | DUSUP / Dutco McConnel Dowell | DUSUP Valve Testing Project | 2” to 14” Dia | - | Testing of Ball and Globe Valves | Dubai |
2015 | JGCS/PTSC | Nighi Son Refinery Project, SBP | 48" | 3 | Gauging & Cleaning, Hydrotesting | Vietnam |
2015 | Krisenergy/Equatorial | Wassana Field Development Project | 6 / 4 | 2.5 / 2.5 | Free Flooding, Pre-Testing, Post Intallation Leak Testing of Flexible Hoses | Thailand |
2015 | DUSUP / Dutco McConnel Dowell | DUSUP Valve Testing Project | 14” Dia | - | Testing of Globe Valve | Dubai |
2015 | DUSUP / Dutco McConnel Dowell | DUSUP Valve Testing Project | 14”to 30” Dia | - | Testing of Ball Valves, Butterfly Valves, Check Valves and Globe Valves | Dubai |
2015 | Saipem | Saudi SPN/STAR LTA T&I 3PDM Project | 2 x 12” Flexible Lines | 1.90/0.7 | Pre-commissioning Works | Saudi Arabia |
2015 | Saipem | Saudi Aramco – LTA Project | 1 x 16” 2 x 12” |
Various lengths | Nitrogen Purging Works | Saudi Arabia |
2015 | EXTERRAN – Bellargi Energy | Dana Gas Project | Zora Gas Plant | - | Nitrogen Leak Testing in Zora Gas Plant | Sharjah |
2015 | Gates Engineering | Equipment Rental | - | - | Rental of pumping equipment spread | Dubai |
2015 | Al Wasimi Holdings / Saudi Aramco/ | Shaibah Interconnecting Pipelines | 36” | 36.00 | Cleaning, Gauging, Hydrotesting, Dewatering, Drying, Nitrogen Purging, Caliper Pigging and Intelligent Pigging | Saudi Arabia |
2015 | Al Wasimi Holdings / Saudi Aramco/ | Shaibah Interconnecting Pipelines | 2 X 44” | 23.60 & 22.60 | Cleaning, Gauging, Hydrotesting, Dewatering, Drying, Nitrogen Purging, Caliper Pigging and Intelligent Pigging | Saudi Arabia |
2015 | Vopak Horizon / NDT Global | UT Inspection | 2 x 16” | Support Services for UT Inspection Survey | Fujairah | |
2015 | NPCC / ZADCO | Chemical Cleaning of Inconel Pipes and Flare Tip Surface | - | - | Chemical Cleaning | Abu Dhabi |
2015 | VTTI / Audex Fujairah LL FZE | VTTI Crude Tank Terminal Project | 48 / 68 m Dia x 28 m Height |
- | Cleaning of Crude Tank | Fujairah |
2015 | Dutco McConnel Dowell / Dana Gas | Dana Gas Offshore Pipeline Project | 12” | 3.1 | Cleaning, Gauging, Hydrotesting, Dewatering, Swabbing, Drying and Nitrogen Purging | Sharjah |
2015 | Dutco McConnel Dowell / Dana Gas | Dana Gas Offshore Pipeline Project | 12” | 3.1 | Caliper Pigging Works | Sharjah |
2015 | Dubai Petroleum | CC-GG Pipeline Project | 8” | 3.20 | Flooding, Cleaning/Gauging, Hydrotesting, Dewatering, Passivation and Nitrogen Purging | Dubai |
2015 | Forequest | - | - | - | Equipmental Rental | Dubai |
2015 | Saipem SPA | Aribiyah and Hasbah Offshore and Onshore Facilities Project | 1 x 4” 2 x 10” 13 x 12” |
71.68 70.95/73.77 1.36 to 5.93 |
Nitrogen Purging Works | Saudi Arabia |
2015 | Contracting and Trading Company (CAT) | Saadiyat Island – District Cooling Piping Network | 8” to 42” | 24 | High Velocity Flushing, Hydrotesting, Chemical Cleaning & Chemical Treatment | Abu Dhabi |
2015 | Al Nasr Contracting Company | Takreer Project | - | - | Supply of dryer unit + operator on rental basis | Abu Dhabi |
2015 | Petrofac | ADCO Asab | - | - | Supply of diesel pumping unit + operator First & Second campaign completed |
Abu Dhabi |
2015 | Al Nasr Contracting Company / Gasco | 10” Pipeline Partial Replacement Project | 10” | 6.3 | De-commissioning, Pre-commissioning and Commissioning Works | Abu Dhabi |
2015 | Dubai Petroleum | IP Project | - | - | Supply of launcher and receiver on rental basis | Dubai |
2015 | Rosen – Total ABK | Assistance for Inspection Pigging Works | 16” | 4 | Pigging Works | Abu Dhabi |
2015 | Lin Scan | Equipment Rental for Inline Inspection Pigging at Gasco Asab | - | - | Rental of pumping spread and manpower for inline inspection pigging | Abu Dhabi |
2015 | ONGC/Bumi Armada | Cluster 7 FPSO Project | 12”/10”/6” | 1/1/1 | Free Flooding, Pre-Testing, Post Intallation Leak Testing of Flexible Hoses for FPSO | India |
2015 | Momin Oil Industry | 8” Pipeline Pre-commissioning Works | 8” | 0.45 | Dewatering, Swabbing and Drying | Jabel Ali, Dubai |
2015 | Dubai Petroleum | Cleaning Pigging Campaign 2015 | 3 x 18” 1 x 14” |
1 to 3 km | Cleaning Pigging of various pipelines | Dubai |
2015 | Saipem SPA | Saudi Aramco Wasit Project | - | 16 pipelines | Nitrogen Services for Dewatering & Inert Gas lay up for pipelines | Saudi Arabia |
2015 | Overseas AST Company LLC | Design & Build Contract Development and Operating of Fuel System at Station in (DHA-AV-02) Dhafrah Air Base Camp No. (136601) | Fuel Piping System Network of various diameters 4” to 16” |
9.652 | Air Blowling, Pneumatic Testing and Air Drying | Abu Dhabi |
2015 | NDT Global/ ADCO | Assisting in UT inspection survey | 16” | 10.00 | Assisting in UT inspection survey and drying works | Abu Dhabi |
2015 | Kerzner International, Dubai | Atlantis Hotel Sea Water Intake Pipe GPS Mapping Works | 42” Sea Intake Pipe | 0.90 | GPS Mapping Works | Dubai |
2015 | Visen Polymers FZC / Quality International Company Limited | Investors Pipeline to Deep Water Berth AT Hamriyah Port | 1 x 8” / 1 x 10” / 2 x 12” | 1.30 Km each | Cleaning, Gauging, Hydrotesting, Dewatering & Drying Works | Hamriyah Port in Sharjah. |
2015 | Calligan International, Dubai | Equipment Rental | - | - | Rental of centrifugal pumps | Dubai |
2015 | Stats Group, Dubai | Equipment Rental | - | - | Rental of pumps and manpower | Abu Dhabi |
2015 | Technip - Dubai Petroleum | Jalilah B Pipeline Project | 10” | 7.70 | Dewatering & Nitrogen Purging | Dubai |
2015 | Lin Scan | ADCO NEB Project | - | - | Supply of Break Tanks on Rental Basis | Abu Dhabi |
2015 | G.S Engineering | Takreer IRP II Project | - | - | Equipment Rental | Abu Dhabi |
2015 | Technip | Total ABK Project | - | - | Supply of chemicals and Pigs | Abu Dhabi |
Year | Client / Contractor | Project Title | Dia (Inches) |
Length (km) |
Scope of Work | Location |
2014-15 | Dubai Petroleum/Technip | Flooding, Cleaning, Gauging, Hydro-testing, De-watering with nitrogen | 30” / 18” /12” (10 Pipelines |
34 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering with nitrogen | Dubai |
2014 | Takreer/GS Constructions/Essar Overseas Construction Limited | Cleaning & Gauging, Hydrotesting, Dewatering and Drying. | 28” | 2 x 95 | Cleaning & Gauging, Hydrotesting, Dewatering and Drying. | Ruwais |
2014 | Essar Overseas Construction/GASCO | 16” Condensate Pipeline Replacement Project | - | - | Hire of Equipments | Abu Dhabi |
2014 | NDT / ADCO | Assisting in intelligent pigging survey | Assisting in intelligent pigging survey | Habshan/ Bab |
||
2014 | Galfar Engineering / ADCO | Construction of Flowlines & Well Head Installation at Buhasa | 4”, 6” & 8” | Various Lengths | Cleaning & Gauging, Hydrotesting and Dewatering | Buhasa |
2014 | Matrix Constructions | EPC for Batch-1 Plant Modification Project | 4” | 0.266 & 0.220 | Cleaning & Gauging, Hydrotesting, Dewatering, Drying and Nitrogen Purging Works | Buhasa |
2014 | Dubai Petroleum | FA-FB 8” Gas Pipeline Repair Project | 8” | 7.60 | Dewatering, Chemical Batching and Nitrogen Purging | Dubai |
2014 | Dubai Petroleum | FA-FB 8” Gas Pipeline Repair Project | 8” | 7.60 | Dewatering and Nitrogen Purging | Dubai |
2014 | Dubai Petroleum | FA-FB 16” Pipeline Shutdown Project | 16” | 7.60 | De-cruding, Dewatering and Nitrogen Purging | Dubai |
2014 | PTSC/ Swiber Offshore Construction | Su Tu Nau Development Project | 6”/10”/12”/14”/18” – 7 P/Lines | 6-12 | Flooding, Cleaning, Gauging, Hydrotesting, Dewatering | Vietnam |
2014 | Pertamina Hulu Energy / PT Rajawali Swiber | EPCI GG New Field Development | 12” | 35 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering, Drying, Nitrogen Purging | Indonesia |
2014 | Premier Oil Indonesia / PT Rajawali Swiber Chakrawala | Naga Pelikan Project | 14”/12” | 20/32 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering, Drying, Nitrogen Purging | Indonesia |
2014 | PCML ( Petronas) / Hyundai Heavy Industries |
Yetagun Development Project | 10” | 10 | Flooding, Cleaning, Gauging, Hydro-testing, Intelligent Pigging, De-watering, Swabbing, Drying, Nitrogen Purging | Myanmar |
2014 | South Oil Company (SOC) / Leighton Offshore | Crude Oil Export Facilities Project | 48” (5 Pipelines) |
65 | Flood, Clean, Gauge, Hydro test, Leak Testing, Dewatering and Commissioning with Crude | Iraq |
2014 | Saudi Aramco / McDermott Arabia Company Limited/ J.RayMcdermott |
Maintain Potential Facilities Project | 12” | 5.3 | Leak Testing and Wetlayup of Flexible pipeline | Saudi Arabia |
2014 | Hitachi Power | Pacific Power Station, Singapore | 8” | 0.5 | Cleaning & Gauging | Singapore |
2014 | Oil and Natural Gas Corporation (ONGC) / Punj Lloyd Limited | WO-16 & SB-14 Pipeline Project & Buckle detection Project | 14”/12”/8” ( 6 Pipelines) |
67 /32 / 22 | Flooding, Cleaning, Gauging, Hydro-testing & Buckle detection of pipelines of 12” x 11 Kms (WO-5 to WO-15). | India |
2014 | Conoco Phillips/Swiber | South Belut Project | 12” / 8” | 1 / 0.5 | Spool Testings | Indonesia |
2014 | Oil and Natural Gas Corporation (ONGC) / Leighton Offshore | Pipeline Replacement Project (PRP-3) | 14”/12”/10” ( 4 Pipelines) |
56 | Flooding, Cleaning, Gauging & Hydro-testing | India |
2014 | Gujarat State Petroleum Corporation Ltd. (GSPC) / Punj Lloyd Limited |
Deen Dayal Field Development Pipeline Project & Slug Catcher project | 20” dia & 10” dia Pipelines | 25 & 17 | Flooding, Cleaning, Gauging, Hydro-testing, Intelligent Pigging, De-watering, Swabbing, Drying, Nitrogen Purging | India |
2014 | British Gas India Ltd. / Essar Offshore Subsea Ltd | Hydrotesting & Leak testing for BG Panna New SPM Project | 12” | Flooding, Cleaning, Gauging & Hydrotesting | India | |
2014 | Cairn Energy India Ltd / UGL Engineering Pvt. Ltd. | Pre-commissioning of SPM at Bhogat | SPM hydrotesting | India | ||
2014 | Brunei Shell Petroleum / Swiber Offshore | Pipeline Replacement Project 2 | 16” / 12” / 8” (12 Pipelines) |
29.5 | Flooding, Cleaning, Gauging, Hydro-testing, Leak Testing | Brunei |
Year | Client / Contractor | Project Title | Dia (Inches) |
Length (km) |
Scope of Work | Location |
2013/14 | Galfar Engineering / ADCO | Bab Gas Surface Facilities Modification and Remedial Works | 6” | >7.3, 10.0, 8.3, 2.5 & 5.1 | Cleaning Pigging and Hydrotesting | >Habshan |
2013 | Dubai Petroleum | Pipeline Replacement | 12’’,18’’,30’’ | 34 | Flooding, Cleaning, Gauging, Hydrotesting | >Dubai |
2013 | GASCO / Larsen and Toubro | Habshan- Ruwais –Sweihat Pipeline Project | 52” / 48” | 137 | Supply of equipment and Manpower for pipeline Pre commissioning | >Abu Dhabi |
2013 | GASCO / Alsa Engineering and Construction | Mirfa -Ruwais Nitrogen Pipeline Project | 16” | 75 | Supply of equipment and Manpower for pipeline Pre commissioning | Abu Dhabi |
2013 | Total Abu Al Bukhoosh / Rosen | Intelligent Pigging Project Contract No:4800000158 | 30”/ 20” / 16” 10” /8” / 6” (15 Pipelines) |
159 | Support services for Intelligent Pigging of Pipelines | >Abu Dhabi |
2013 | Vopak Horizon Terminals Limited / Cylingas LLC | VHFL Tank Farm Project | 39m dia (9 Tanks) |
- | Hydrotesting of Crude and Product Storage Tanks | Fujairah |
2013 | South oil Company (SOC) | Crude oil Export Facilities | 5X48’’ | 65 | Flood, Clean, Gauge, Hydro test, Leak Testing, Dewatering and Commissioning with Crude | Iraq |
2013 | Saudi Aramco / McDermott Arabia Company Limited/ J.RayMcdermott |
Maintain Potential Facilities | 16’’/20’’ | 5.3 | Flooding, Cleaning, Gauging, Hydrotesting, Baseline Survey, wet layup | Saudi Arabia |
2013 | Total E&P Indonesia/Swiber | Sisi Nubi Project | 16”/16”/20” | 5.5/8/3.5 | Flooding of subsea pipelines | Indonesia |
2013 | Oil and Natural Gas Corporation (ONGC) / Swiber Offshore Construction Pte. Ltd | Cluster 7 Pipeline Project | 16” / 14” /12” 10” /8” /6” / 4” (21 Pipelines) |
211 | Flooding, Cleaning, Gauging & Hydro-testing | India |
2013 | Conoco Phillips / Swiber Offshore | South Belut Project | 14”/ 8” | 32/5 | FCG, post tie in Leak Test, Dewatering, Gel Pigging, Dewatering with Nitrogen | Indonesia |
2013 | Mangalore Refinery and Petrochemicals Limited (MRPL) / Leighton Offshore | MRPL Refinery Project | 48” | 17.4 | Flooding, Cleaning, Gauging, Hydrotest, Leak Testing of SPM | India |
2013 | Petronet LNG Limited / TOYO | Pigging works for 32”LNG & 10:NG Line at PLDSJ Project for Petronet LNG Project | 32”/10” | 7.5 | Cleaning | India |
2013 | Mangalore Refinery and Petrochemicals Limited (MRPL) / GOL Offshore Ltd | Rectification work for Gasket replacement Project | 48” | Leak testing of SPM | India | |
2013 | Reliance Ltd. | Pigging & Rope pulling project | 6” | 35 | Pigging & Rope Pulling | India |
2013 | ONGC Mangalore Petrochemicals Ltd. (OMPL) | Cleaning of pipelines by pigging method | 14”/10”/8”/6” | 6/6/14/13 | Cleaning | India |
2013 | Bharat Petroleum Corporation Ltd. (BPCL) | Hydrotesting of Dock Pipelines | 24” | 12 | Flooding, cleaning, gauging & Hydrotesting | India |
2013 | Petro Vietnam PTSC / Hyundai Heavy Industries | Thang Long Dang DU Project | 12” / 10” / 8” / 6” (15 Pipelines) |
19 | FCG, Hydrotest, Post Tie in Leak Test | Vietnam |
2013 | Mubadala Petroleum / Swiber Offshore | Pearl Oil Ruby Pipeline | 14” | 315 | FCG, Hydrotest, Caliper Pigging, Dewatering, Vacuum Drying, Nitrogen packing | Indonesia |
2013 | Brunei Shell Petroleum / Swiber Offshore | Champion Water Flood | 16” / 12” / 8” (12 Pipelines) |
29.5 | Flooding, Cleaning, Gauging, Hydro-testing, Leak Testing | Brunei |
2013 | Brunei Shell Petroleum / Swiber Offshore | Osprey Field Development Project | 10”/16” | 9/18 | Flooding, Cleaning, Gauging, Hydrotesting, Dewatering, Drying and N2 Purging | Brunei |
2013 | Santos/PT rajawali Swiber | Santos Puelong Project | 10” | 11 | Flooding, Cleaning & Gauging, Hydrotesting, Dewatering, Drying, N2 Purging | Indonesia |
2013 | Oil and Natural Gas Corporation(ONGC) / Subsea 7 | GS-1 GS-15 Deep sea Project | 10” / 8” (3 Pipelines) |
55 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering, Glycol Swabbing, Baseline Survey, Nitrogen Purging | Kakinada , India |
2013 | Brunei Shell Petroleum (BSP) / Swiber Offshore | Bulan-Bulan, Osprey Project | 12”/16” | 6/6 | Flooding, Cleaning, Gauging, Hydrotesting, Dewatering, Drying and N2 Purging | Brunei |
2013 | Premier Oil/Swiber | Naga & pelicon | 14’’/12’’ | 19 / 32 | Flooding | Indonesia |
Year | Client / Contractor | Project Title | Dia (Inches) |
Length (km) |
Scope of Work | Location |
2012 | EMCO/GASCO | Replacement of 16” and 10” Gas Pipeline | 16”& 10” | 5.2 | Flooding, Cleaning, Gauging, Hydrotesting, Dewatering & Drying, Nitrogen Packing | Bab Field, Abu Dhabi |
2012 | ADCO / Galfar Engineering and Contracting Emirates LLC | Segregation of units 6 & 7 and D Flow lines (CONTRACT No. 15166.01 / EC 10780) | 8” (9 Pipelines) |
3.92 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering, Swabbing, Drying, Nitrogen Purging | Abu Dhabi |
2012 | GASCO / Union Gas Company | Jindal Steel Plant Pipeline Project | 8” | 1.5 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering, Swabbing, Drying, Nitrogen Purging | Abu Dhabi |
2012 | ENOC Lubricants and Grease Manufacturing / Cylingas LLC | ELOMP Tank Farm Project | 15/7.5/5.3 m dia (7 Tanks) |
Fresh Water cleaning and blasting of Product Storage Tanks | Fujairah | |
2012 | Brunei Shell/Swiber | PRP - Decommissioning Project | 4”/8”/10”/12” 12 Pipelines |
1 to 16 | Cleaning, De-Oiling & Decommissioning of Pipelines | Brunei |
2012 | Govt. of Tanzania / Leighton Offshore | Tanzania SPM Project | 28” / 24” (2 Pipelines) |
14.9 | Flooding, Cleaning, Gauging, Hydrotest, Leak Testing of SPM Systems | Tanzania |
2012 | ADCO / Galfar Emirates | Bab Gas Surface Facilities | 6’’,8’’,10’’ | 32 | Flooding, Cleaning, Gauging, Hydrotesting, Dewatering & Drying, Nitrogen Packing | Abu Dhabi |
2012 | Brunei Shell/ Swiber | Danuu- Babut Subsea Development | 12”/12” | 22/1 | Flooding, Cleaning, Gauging, Hydrotesting, Dewatering & Drying, Nitrogen Packing | Offshore, Brunei |
2012 | Alliance LNG/ Petronas / Stone House/ Maser Offshore |
Alliance LNG Re-Gasification Project | 30” | 4 | Flooding, Cleaning, Gauging, Hydrotesting, Dewatering and Drying | Malaysia |
2012 | Indian Oil Corporation (IOCL) / Hyundai Heavy Industries | IOCL Paradip SPM Project | 48” (5 Pipelines) |
69 km | Flooding, Cleaning, Gauging, Hydrotesting, Leak Testing, Caliper EGP Survey ,Leak Testing of SPM Systems | India |
2012 | Saudi Aramco / McDermott Arabia Company Limited/ J.Ray.McDermott | Safaniya Field Dev Project (Phase-1) | 16” (6 Pipelines) |
35 km | De-cruding, Flooding, Cleaning, Gauging , Hydrotesting and Wet Layup | Saudi Arabia |
2012 | ConocoPhillips / Kreuz Subsea/ PT RajawaliSwiberCakrawala | Bawal Field Development Project | 14” | 40km | Dewatering & Nitrogen Packing | Indonesia |
2012 | British Gas Exploration & Production India Limited / Punj Lloyd Limited | Panna SBM Project | 12” | 3 | Flooding, Cleaning, Gauging & Hydro-testing, Leak Testing of SPM System | India |
2012 | Oil and Natural Gas Corporation (ONGC) / Swiber Offshore Construction Pte. Ltd | D1 Pipeline Project | 16” / 14” / 12” / 4” (4 Pipelines) |
18 | Flooding, Cleaning, Gauging & Hydro-testing | India |
2012 | Oil and Natural Gas Corporation (ONGC) / Swiber Offshore Construction Pte. Ltd | B-193 Subsea Pipeline Project | 16” / 12” / 10”/ 8” /2” (14 Pipelines) |
214.3 | Flooding, Cleaning, Gauging & Hydro-testing | India |
2012 | Oil and Natural Gas Corporation (ONGC) / Valentine Maritime Ltd / Valentine Maritime Mauritius Ltd | B Series & N 15 & N16 Pipeline Project | 16”/ 14”/ 10” /8” (4 Pipelines) |
51.35 | De-watering Drying & N2 Purging of Subsea Pipelines | India |
Year | Client / Contractor | Project Title | Dia (Inches) |
Length (km) |
Scope of Work | Location |
2011 | SANTOS/ Swiber Offshore |
Wortel Field Development Project | 10” | 10.4 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering, Swabbing, Drying, Nitrogen Purging | Madura Straits, Indonesia |
2011 | Dubai Petroleum / Technip (Abu Dhabi) | Jalilah Field Development Project | 12” / 6” (2 Pipelines) |
54 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering with nitrogen | Dubai |
2011 | Brunei Shell/ Swiber Offshore |
Champion Flood Project | 8' | 1.1 | Cleaning and Hydrotesting of internally HDPE lined WI Pipeline | Offshore, Brunei |
2011 | ONGC/ Swiber Offshore |
ICP-R Project | 28”/4” | 1/1 | Flooding, Cleaning, Gauging and Hydrotesting | India |
2011 | ONGC/ Leighton Contractors |
GS-1 GS-15 Deep sea Project | 10” / 8” (3 Pipelines) |
55 | Flooding, Cleaning, Gauging, Caliper survey and Hydro testing | Kakinada , India |
2011 | ONGC/ Swiber Offshore |
North Tapti Gas Field Development Project | 18” / 12” (2 Pipelines) |
17.5 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering, Swabbing, Drying, Nitrogen Purging | India |
2011 | GAIL/ Fernas Constructions |
Dahej –Viajypur (Phase-II) Pipeline Project | 48” (3 Sections) |
290 | Bulk Dewatering, Swabbing, Drying, Caliper survey and Vacuum Drying | India |
2011 | ONGC/ Leighton Contractors |
Pipeline Replacement Project (Phase-III) | 14”/ 12”/ 10” /6” (12 Pipelines) |
79.8 | Flooding, Cleaning, Gauging & Hydro-testing | India |
2011 | ONGC/ Swiber Offshore |
Mumbai High North Re-Development Project | 6", 8", 10" 12", 14" (total 14 segments | 90 | Flooding, Cleaning, Gauging, Hydrotesting, Dewatering | India |
2011 | British Gas/ Swiber Offshore |
BG PL Project | 14"/4” | 14/14 | Flooding, Cleaning, Gauging, Hydrotesting, Dewatering & Drying and Nitrogen Packing | Panna Field, West Coast, India |
Year | Client / Contractor | Project Title | Dia (Inches) |
Length (km) |
Scope of Work | Location |
2010 | Abu Dhabi Gas Industries (GASCO) / AL Fannar Contracting | Gas Supply Pipeline | 24” | 2.7 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering, Swabbing, Drying, Nitrogen Purging | Abu Dhabi |
2010 | ADCO / Al Hussam General Contracting Co. | Bab Fields Replacement Pipeline | 6”/8’ ( 6 Pipelines) |
30 | Flooding, Cleaning, Gauging, Hydro-testing, De-watering, Swabbing, Drying, Nitrogen Purging | Abu Dhabi |
2010 | Ceylon Petroleum / Leighton Contractors Pvt Ltd | Muthurajawela Tank Farm Project | 16” | 9.1 | Flooding, Cleaning, Gauging, Caliper Pigging and Hydro-testing | Sri Lanka |
2010 | Hindustan Petroleum Corporation (HPCL) / Leighton Offshore | Vizag Refinery Project | 48” | 5.5 | Flooding, Cleaning, Gauging, Hydrotest, Leak Testing of SPM Systems | India |
Year | Client / Contractor | Project Title | Dia (Inches) |
Length (km) |
Scope of Work | Location |
2009 | Saudi Aramco / McDermott Arabia Company Limited/ J.Ray.McDermott | Long Term Agreement Project | 16” (5 Pipelines) |
30 km | Flooding, Cleaning, Gauging , Hydrotesting and Wet Layup | Saudi Arabia |
2009 | Oil and Natural Gas Corporation (ONGC) / Leighton Offshore Contractors Pvt. Ltd | Pipeline Replacement Project (Phase-2) | 24”/16”/ 12” / 8” / 6” (17 Pipelines) |
58.4 | Flooding, Cleaning, Gauging & Hydro-testing | Bombay High, India |
2009 | Oil and Natural Gas Corporation (ONGC) / Global Industries Pvt. Ltd | Pipeline Replacement Project (Phase-1) | 18”/16”/ 12” (6 Pipelines) |
54.2 | Flooding, Cleaning, Gauging & Hydro-testing | Bombay High, India |
2009 | Oil and Natural Gas Corporation (ONGC) / Punj Lloyd Limited | Heera Redevelopment Project | 16”/14”/ 12”/10”/8” (11 Pipelines) |
69.1 | Flooding, Cleaning, Gauging & Hydro-testing | Heera Field, India |
2009 | British Gas Exploration & Production India Limited / Swiber offshore Constructions Pvt Ltd | BG Hydra Pipeline Project | 14”/12”/ 4”/1.25” (6 Pipelines) |
52.7 | Flooding, Cleaning, Gauging & Hydro-testing, High speed Flushing ,Dewatering, Drying and Nitrogen Packing | Tapti Field, India |